Graphic Design And Digital Coordinator (Vpsg4)

West Gate Tunnel Project

Melbourne, VIC

Posted 4/16/2021

The West Gate Tunnel Project, Major Transport Infrastructure Authority (WGTP MTIA) is responsible for the management of the WGTP on behalf of the Victorian Government. The WGTP will directly link the West Gate Freeway to the Port, CityLink and the city via twin tunnels under Yarraville, a new crossing of the Maribyrnong River and an elevated road above Footscray Road. It will provide a much-needed alternative to the West Gate Bridge and reduce travel time, improve freight access to the Port of Melbourne and remove thousands of trucks from residential roads. 6,000 jobs will be created, and the project will deliver an approximate $11 billion boost to Victoria's economy. Public Private Partnership contracts to build and operate the project were signed in December 2017.

About the role

  • Exciting opportunity to join the West Gate Tunnel Project
  • Be part of a high performing team
  • City Shaping Major Transport project

The West Gate Tunnel Project, Major Transport Infrastructure Authority (WGTP MTIA) has an opportunity for an experienced Graphic Design and Digital Coordinator to join the Communications and Engagement team on the West Gate Tunnel Project (WGTP).

Part of the WGTP Digital team and reporting to the Manager (Digital), the Graphic Design and Digital Coordinator will develop and produce highly engaging video content and graphic design collateral that effectively communicates the key messages of West Gate Tunnel Project throughout the life of the project.

The role will be responsible for the in-house finished production of videos and graphic assets for WGTP social and digital media channels and collaborate closely with the communications team on creative content development to ensure the end product is visually engaging and reflective of the WGTP brand.

How to apply

Applications including a cover letter and resume are to be submitted online by visiting www.careers.vic.gov.au. Individual responses to the Key Selection Criteria are not required. Your cover letter should include a summary taking into account the KSC as a whole and why you are interested in the role. All documents should be attached as a Microsoft Office Word document.

WGTP MTIA is an equal opportunity employer and welcomes applicants from a diverse range of backgrounds and strongly encourages applications from Aboriginal and Torres Strait Islander people.

The WGTP MTIA offers reasonable adjustments for applicants with disabilities on request.

For a confidential discussion, please contact Jason Setchell, Manager Digital on 03 9938 0552.

Applications close 11.59pm – 19 April 2021.

To view and apply for this job on the web visit:

https://jobs.bigbuild.vic.gov.au/job/15514665